Skip to content

This is a sample website. Business details are fictional.I want this website

Your Business Name
Detached house with a stone facade and a yardSample image

Nashville and nearby

Large home renovation

Interior, exterior and deck or patio work run on one schedule. Even if you are not on site, you get a photo report every week.

A photo progress report on the same day every week

Many owners of larger homes are not on site while the work happens, whether it is a second home or a property they are moving into later. The weekly report lists that week's work, next week's plan and the decisions waiting on your approval.

Two-story detached house with a white exteriorSample image
Marble and stone samplesSample image

Exterior, deck and interior materials are planned on one schedule.

The scope comes in three parts

Interior

Floors, stairs, bathrooms and kitchens, interior paint, lighting rough-in. Planned floor by floor on one schedule.

Exterior

Exterior paint, siding repair, window and door replacement. Scaffolding setup and notifying neighbors and the HOA are on us.

Deck, patio and grounds

Deck and balcony waterproofing, patio surfaces, garden wall paint. Exterior work is sequenced around the weather.

The work runs in two phases

Planning

At the consultation we walk and photograph every floor and the exterior. We put together the scope list, material choices and a floor-by-floor schedule. This phase takes 1-2 weeks.

Construction

Rough work moves top to bottom, finish work bottom to top. Exterior work runs in parallel, timed to the weather. We finish with a punch list walk at handover.

Budget range, October 2026

Budget range for large home renovation

Scope varies too much on larger homes for a table, so we give a written estimate after the consultation. Ranges cover labor and standard materials; permit fees are listed separately.

Sample price range; replace it with your own prices.

Line-item breakdown

The exact figure comes in a written estimate after the consultation.

Questions from owners of larger homes

How long does work on a large home take?

It depends on scope: interior paint alone takes 2-3 weeks, a full interior remodel 8-12 weeks, and 12-16 weeks with the exterior included.

We live out of town. How do we follow the project?

Every week, on the same day, you get a progress report with photos and video. Decisions such as color or material changes are never carried out without your written approval.

Does the season matter for exterior paint?

Yes. Exterior paint is not applied below about 40°F or in wet weather. Spring and fall are the most reliable seasons.

Can we choose materials remotely?

Yes. We send samples by photo and video. For items like paint and tile we do a test patch on the wall and wait for your approval before going ahead.

See where we work on the service areas page.

Often done together with this job: whole-home remodeling, bathroom remodeling and kitchen remodeling. To book a consultation, reach us through the contact page.

Consultation by appointment

Consultations for larger homes are by appointment and take 1-2 hours. If you are out of town, we start with a video call.

+1 (555) 010-0100

Prefer to write? Use WhatsApp.