Whole-home remodeling

Demolition to final trim under one contract, with one point of contact. A 1,000-1,200 sq ft home with a standard scope takes 6-8 weeks on site once permits are issued. This page spells out exactly where the scope starts and ends.
Opened-up wall and scaffolding during demolitionSample image
Bright, finished living room at handoverSample image

Demolition day and handover day: the two ends of the same contract.

What is in scope, and what is not

This list is attached to the contract. We go through it item by item at the consultation.

Included

  • Flooring (hardwood, LVP, tile)
  • Interior doors and window replacement
  • Drywall repair, skim coating and paint
  • Kitchen cabinet fabrication and installation
  • Bathroom vanities and fixture installation
  • Electrical rewiring and panel work
  • Plumbing and gas lines inside the home
  • Building permits and inspections

Not included

  • Furniture (sofas, beds, tables)
  • Appliances
  • HVAC equipment (rough-in for it is included)
  • HOA common areas and exterior grounds

Budget range, October 2026

$85,000 - $180,000

Budget range for whole-home remodeling

A complete interior remodel of a 1,000-2,000 sq ft home typically runs $85,000-$180,000. Ranges cover labor and standard materials; permit fees are listed separately.

Sample price range; replace it with your own prices.

Line-item breakdown

The exact figure comes in a written estimate after the consultation.

The order of work in six steps

  1. 01

    Demolition and tear-out

    Old flooring, cabinets and, where needed, walls come out. Debris goes into a dumpster and is hauled away on schedule.

  2. 02

    Electrical and plumbing rough-in

    Lines are run again to the new layout by licensed trades. In older homes we do not leave plumbing out of scope; old pipe will not carry a new bathroom.

  3. 03

    Inspections and waterproofing

    Rough-in inspections are passed before walls close. Wet areas are waterproofed and flood-tested before any tile goes down.

  4. 04

    Tile and flooring

    Bathroom and laundry tile first, then floors in the living areas and bedrooms. Hardwood goes down last.

  5. 05

    Cabinet measuring and fabrication

    Kitchen and bath cabinets are measured after tile is finished. Shop fabrication takes 2-3 weeks.

  6. 06

    Paint and final trim

    Final coat of paint, cabinet installation, fixtures and trim-out. Before handover we walk the punch list with you.

Sample schedule for a 1,000-1,200 sq ft home

Every home gets its own schedule after the consultation. This table shows the typical flow of a standard-scope job once permits are issued.

WeekWork done
Week 1Demolition, tear-out, debris removal, electrical and plumbing rough-in
Weeks 2-3Rough-in inspections, waterproofing, drywall and ceiling work; cabinet measurements go to the shop
Weeks 3-4Bathroom tile and flooring
Weeks 4-5Primer and first coat of paint, interior doors
Weeks 5-6Kitchen and bath cabinet installation, fixture connections
Weeks 6-8Final coat of paint, caulking and detail work, final inspection, punch list walk, handover

Whole-home remodeling questions

What does a whole-home remodel include?

Flooring, interior doors and windows, drywall and paint, kitchen and bath cabinets, fixtures, electrical and plumbing, plus permits and inspections. Furniture and appliances are not included. The scope list is attached to the contract.

How long does a whole-home remodel of 1,000-1,200 sq ft take?

With a standard scope it takes 6-8 weeks on site after permits are issued. Two things stretch the schedule: custom cabinets waiting on fabrication and HOA work-hour limits. We discuss both at the consultation and build them into the schedule from day one.

Can we live in the house during the remodel?

Not during a full remodel; water and power are off for much of the first two weeks and the floors are torn up. A room-by-room partial remodel can work while you live there, but it takes longer.

How does the payment schedule work?

The contract sets a draw schedule tied to completed milestones. A typical flow: a deposit at signing, a second payment after rough-in, a third after tile, and the balance at handover.

Do we have to replace the wiring and plumbing in an older home?

In homes built before 1980, usually yes. Galvanized steel pipe loses pressure and leaks over time, and older wiring cannot handle the load of a modern kitchen. Code also requires GFCI and AFCI protection in many rooms.

Do you buy the materials, or do we?

Either works. If you buy through us, the brand and model go into the contract. If you prefer to buy them yourself, we give you the quantity list; the labor price stays the same.

Often done together with this job: bathroom remodeling, kitchen remodeling and painting and finishes. To book a consultation, reach us through the contact page.

Let's talk about your home at a consultation

The consultation takes 30-45 minutes. Your written estimate follows within a few business days.